top of page
Enuri's Portfolio.
I
Industrialized Building Systems (IBS)
Project 1 is a collaborative initiative focused on the Industrialised Building System (IBS).
We had to create simple flat units utilising the IBS construction system, allowing us to be exposed to and engage in a critical and analytical examination of the diverse IBS construction methods, and engage students in IBS rating assessment.
Presentation Slides
Reflection
Project 1 was relatively a difficult one to complete, as we had such a short period of time. Not only did we have to come up with the structures, we also had to conduct research, create poems, study precedents, poetic architecture, concentric & linear architecture, and so much more. It was so draining to lead and be responsible for a large group of people while also tackling the project. In addition, I found myself having to complete my group's delegated tasks because i didn't have the heart to tell them their work was rejected by our tutors. Overall, i am grateful to have been placed in such a competent group, and i am satisfied with our end product.
Discipline Specific Knowledge
Lifelong Learning
Interpersonal Skills
bottom of page